ZJ / ZJL
ZJ / ZJL Series Slurry Pump
Heavy-duty single-stage slurry pump with a high-hardness wear-resistant wet end, for mill discharge, tailings and dense-medium duty.
- Flow range
- 4 – 2,330 m³/h
- Head range
- 9 – 133 m
- Motor power
- 0.55 – 800 kW
Centrifugal slurry pumps · since 1986
We cast, machine and performance-test centrifugal slurry pumps, FGD pumps and process pumps in our own works in Anguo, Hebei — engineered for mining, coal preparation, power and metallurgical plants that cannot afford to stop.
Product range
From heavy-duty slurry pumps for mill discharge to multistage boiler feed pumps and chemical process pumps. Every series is built to a published Chinese or international standard, with the wetted-part material chosen for the duty.
13 series
Slurry Pumps
Centrifugal slurry pumps for mill discharge, tailings, ash and dense-medium duty, with alloy, rubber…
2 series
FGD & Desulfurization Pumps
Slurry pumps for flue-gas desulfurization: limestone slurry circulation, gypsum removal, reclaim and sump duty.
1 series
Gravel & Dredge Pumps
Single-casing gravel pumps for solids too large for a standard slurry pump — dredging,…
5 series
Water & Wastewater Pumps
Sewage, drainage, mud and self-priming pumps for municipal and industrial water handling.
2 series
Clean Water & Pipeline Pumps
End-suction, in-line and pipeline pumps for building services, heating, cooling and general water supply.
6 series
Multistage & Boiler Feed Pumps
Segmental multistage pumps for mine drainage, boiler feed and high-head water supply, to 2,070…
8 series
Chemical & Process Pumps
ISO 2858 chemical pumps, fluoroplastic, stainless steel and stock pumps for corrosive and process…
2 series
Double Suction Pumps
Horizontally split, double-suction pumps for large water flows on municipal, power and irrigation schemes.
Flagship series
Flow, head and motor power ranges below are taken from the printed catalogue. Selection is confirmed against your duty point before an order is accepted.
ZJ / ZJL
Heavy-duty single-stage slurry pump with a high-hardness wear-resistant wet end, for mill discharge, tailings and dense-medium duty.
DT / DTL
Flue-gas desulfurisation pump for limestone slurry circulation, gypsum removal and sump duty.
G / GH
Gravel pump for solids too large for a standard slurry pump, with a clamp-band single casing.
Capability
Casting, machining, assembly and performance testing happen in the same works, which is why drawings and material changes can be handled without a supply chain in between.
In-house foundry producing high-chrome and wear-resistant iron castings for wet-end components.
CAD and CAPP are used for design and process planning; impellers and liners are machined to drawing.
A dedicated slurry pump test station verifies performance before dispatch, backed by a physical and chemical laboratory and metrology room.
Applications
The catalogue covers mines, coal preparation plants, power stations, metallurgical works and chemical plants. Tell us the medium, the solids content and the duty point, and we will shortlist the series.
Tailings, concentrate and mill discharge duty
Heavy-media, slime and ash handling
FGD limestone and gypsum slurry, ash removal
Sinter, slag and scale transport
Dredging and high-solids transport
Corrosive and abrasive process liquids
Sewage, stormwater and sludge
Stock, coating and starch transfer
Certification
Certificates are issued by Guardian Independent Certification Ltd (GICG) and UDEM. Each number can be checked with the issuing body.
Service
Pumps are sold against a duty point, not from a shelf. Our engineers size the pump, support commissioning and keep wear parts available for the life of the unit.
Selection sheets, performance curves and material advice for abrasive or corrosive duties — including special designs for non-standard installations.
Installation and commissioning guidance, operator training, and test records handed over in a documented file.
Wear parts, impellers and liners held to the original drawing, with scheduled inspections and follow-up.
Enquiry
Flow, head, medium, solids content and site conditions are enough for a first recommendation. Our engineers reply in English, usually within one working day.